Industrielle Werke Basel (IWB) Natural gas supply pipelines, Lot 1

Project description:

The scope of work and delivery on the part of Kelag Systems AG included the entire delivery, as well as mounting of a total 2231 m of natural gas supply pipelines for the following projects:

  • Frick, Hintere Bahnhofstrasse (completed)
  • Füllinsdorf, Rheinstrasse (completed)
  • Muttenz, Schänzli (completed)
  • Basel, Weilstrasse, Parkweg and Lörracherstrasse (completed)
  • Pratteln, Ergolz (under construction)

Technical data:

  • DN 150 steel pipes for GAS pipeline, PE + fibre cement mortar, total 180 m
  • DN 200 steel pipes for GAS pipeline, PE + fibre cement mortar, total 894 m
  • DN 300 steel pipes for GAS pipeline, PE + fibre cement mortar, total 1157 m
  • RMA high-pressure valve for GAS including extension stem and blow-out valve
  • Incl. pressure and x-ray testing
  • Incl. insulation
  • Construction year(s) 2017–2019
  • Owner Industrielle Werke Basel (IWB), 4002 Basel, Switzerland