Bristen power station Lot 3 – Hydraulic steel construction work

Project description:

Planning, delivery and assembly of all required hydraulic steel construction components

Scope of delivery:

  • Coarse screen for Tyrolean weir
  • Stoplog for Tyrolean weir
  • Emergency intake sluice
  • Stoplog for degritting penstock
  • Flushing sluice degritting
  • Intake sluice degritting
  • Fine screen
  • Screen cleaning machine
  • HRS degritting system
  • Filling valve for degritting
  • Flushing valve for floating debris
  • Check valve for underground canal
  • Stoplog
  • Construction year(s) 2016
  • Owner KW Bristen AG, c/o Elektrizitätswerk Altdorf AG, 6460 Altdorf, Switzerland